ROOF REPLACEMENT

Roof replacement in Washington, DC

When it is time to replace, we do a full tear-off, inspect the deck and detail the valleys properly. Four layers, one crew, one warranty.

Rowhouse in Petworth after roof, fascia and brick work

A new roof is four layers, and a roof fails at whichever one was done worst. When we replace a roof, we do all four, with one crew, under one warranty, so the estimate covers what is actually wrong and nothing that is not.

The four layers we replace

Decking: the wood, replaced where it is soft

After the tear-off we walk the whole deck, replace only the boards that are soft, and send you photos before we do. Nailing a new roof onto rotten boards is how a new roof sags and leaks in its first few years.

Underlayment: what keeps water out if a shingle fails

A synthetic sheet under every course, with ice and water membrane at the eaves and valleys, where DC roofs take the most water.

Flashing and vents: where almost every leak starts

New metal at the chimney, the walls and every pipe, plus the vents that let the attic breathe. Reusing old flashing on a new roof is the most common reason a new roof leaks.

Shingles: the part the street sees

Shingles shed the water and take the sun. We match the profile and the color to the block, and nail to the manufacturer’s pattern so the warranty holds.

On flat and low-slope roofs the layers are different, insulation, membrane and flashing, but the rule is the same. See flat roofs.

How a replacement works

  1. We look first. On the roof and inside, so we know whether you need a replacement at all. Plenty of roofs only need a repair.
  2. You get a fixed price in writing, with the scope itemised and the things that could change it, like soft decking, named up front.
  3. Tear-off, down to the deck. The old roofing comes off, and the deck is inspected board by board.
  4. The new roof goes on, layer by layer, with new flashing at every wall, chimney and pipe.
  5. Cleanup, before the crew leaves.

A full replacement in DC generally needs a building permit, and in a historic district, visible changes to a roof also go through the Historic Preservation Office. Both should be in the written scope, so you know who is handling them.

Do you need a new roof?

Signs that point to a replacement: leaks in more than one place, the same leak coming back after a proper repair, shingles curling or losing their granules, a flat roof that is cracked across its whole surface, or a deck that gives underfoot. One leak at a chimney on a roof with years left is a repair.

We wrote a longer guide: roof repair or replacement? How to tell.

Who we are

Overall Roofing is the contracting arm of Brightwood Design+Build. One family of crews since 2019, working on DC rowhouses, mid-century ranches and the buildings in between.

Thinking about a new roof? Send us photos through the estimate form or call (202) 495-1440 for a free, written estimate.

FAIR QUESTIONS

What people ask about roof replacement.

What does a new roof cost in DC?

We do not publish one, because a price written before anyone has been on the roof is a guess. You get a fixed price in writing after we have seen it, with the scope itemised and the things that could move it named up front.

Is the estimate actually free, or is it a sales visit?

It is free and it is written. If a visit is needed we say so and you decide. Nobody arrives with a folder, a financing table and a price that only holds until the end of the appointment.

Do you put the new roof over the old one?

When we replace a roof, we do a full tear-off. It is the only way to see the deck, replace what is soft and flash the new roof properly. Building codes also generally do not allow a third roof over two existing ones.

What happens if you find rotten wood?

After the tear-off we walk the whole deck, replace only the boards that are soft, and send you photos before we do.

Your estimate is one click away.

Get Your Free Estimate